What's new
Does anyone know where the top marquee plexi artwork can be bought from for the Cute? Someone linked me to a seller on Otaku but they're MIA.
 
Does anyone know where the top marquee plexi artwork can be bought from for the Cute? Someone linked me to a seller on Otaku but they're MIA.
@hursit can probably do some parts orders in the future.

From my end, only yellow cutes are left, about 8 of them because almost everyone who cancelled/ghosted me/didn't pay were yellows. All people who have paid a deposit have now paid in full except a few of whom I've been in touch with and arrangements are made. @Rg111 please get in touch with me, you haven't responded to any of my recent inquiries and the deadline is coming up. I can't make exceptions or work it out if you don't respond.
 
Actually, i dont think so.
I've regretted most of the time since starting this project. But i just made it to proof myself :)

@Cereth , me and some members of this forum are very tired and we lost too much time to finish this.
Thats why im not sure about the second round. Sorry :(
Sad to hear, I was hoping you do a few more. Really happy I got in on this one. My first candy arcade!
 
Some questions that I've been thinking about recently with these machines shipping soon.

Will a wiring diagram or something similar be included/posted? Watching some of the videos from Hursit, there looks to be some wires that just end (monitor, power, others); so we know exactly what is what. It be doable to figure out if needed, but a diagram or something similar could help.

Once these get stateside, is there any time-frame we'd need to get picked up or shipped? Maybe it's too early for this, but just starting to think about that end of it.
 
Some questions that I've been thinking about recently with these machines shipping soon.

Will a wiring diagram or something similar be included/posted? Watching some of the videos from Hursit, there looks to be some wires that just end (monitor, power, others); so we know exactly what is what. It be doable to figure out if needed, but a diagram or something similar could help.

Once these get stateside, is there any time-frame we'd need to get picked up or shipped? Maybe it's too early for this, but just starting to think about that end of it.
For CA/WA deliveries, I’m probably doing 2 to each location since I’m having about 6 containers of goods to juggle. That won’t happen until end of April at the earliest, most likely sometime in the month of May. For STI, I’ll sending stuff out ASAP, since my warehouse does NOT have space for 6 containers of cabs lol, but I can hang onto a few things for those that need it
 
I second this too. I can imagine me and a lot of other people having so many questions it would be easier if there was a separate thread dedicated. A starter guide or list of things we need to get ready.
 
Of the unpaid orders, 3 have made arrangements with me, 2 have ghosted me. Of those two anyone who paid a deposit will be given an extra grace period, but I will still cancel your order and refund you if you don’t respond, I’m happy to work with people but I absolutely have no tolerance for people who resolve their problems by ignoring them. I value my time higher than anything in the world and I don’t take lightly having mine wasted. If you are one of those people, please respond. Even “I just need more time dealing with stuff” is better than nothing. I don’t think it’s much to ask; I’m a reasonable guy.
 
@hursit can probably do some parts orders in the future.

From my end, only yellow cutes are left, about 8 of them because almost everyone who cancelled/ghosted me/didn't pay were yellows. All people who have paid a deposit have now paid in full except a few of whom I've been in touch with and arrangements are made. @Rg111 please get in touch with me, you haven't responded to any of my recent inquiries and the deadline is coming up. I can't make exceptions or work it out if you don't respond.
This makes me a sad panda.

yellow is a great color :P
 
What happened here!?! =O

1616263528281.png
 
Back
Top