All right.
Fully caught up with the waitlist. If you posted in this thread, your name should be on the waitlist. If I missed you, please post in here and I'll get it squared away.
If you PM'ed: it's gonna be a bit. Please post in here if you're interested in getting on the waitlist.
Very little left to do at this point. Still programming the remaining daughterboard chips. The bulk of what's left of the work is out of my hands now (thank God).
I updated the tracker sheet as well. I am ballparking the "daughterboards programmed" area, because I went in hard on programming C1/C3's, and am now way way behind on C2's and V's. It'll all get there.
The waitlist will absolutely be tackled in smaller batches. I'm thinking 21 at a time. 20-ish of them wouldn't be bad, and I think a 6-8 week turnaround will be entirely reasonable for 21 of them. 80 was.... a lot... Especially coupled with learning curve, and life curveballs.