Hello People
Thanks to everyone, we finally will make this project real
Thanks to
@rewrite ,
@Derick2k ,
@Solmin and
@Cereth especailly
@Cereth made the first deposite payment 12.06.2020 Friday. This is my production plan
1- I will re-draw some parts ( 7-10 days )
2- The CNC cut and Bending staff for the first TEST ( 7 days ) ( Meanwhile i will finish the Bezel and artwork production )
3- Welding and production process for the first prototype ( 5 days )
This process will take 20-25 days maximum.
Then all of the 40pc of cabinet will go to CNC cut and Bending ( it looks like 10 days )( meanwhile i will make the paint are ready and SomePleksiglass. I have already talked with facctory and they can make the original colors. Thanks to
@Derick2k for the original code of YELLOW and GREEN. We only left PINK and i think
@rewrite will fix this problem
I will update the production with pictures and videos as usual . If
@Cereth sees fit, he will place the second 40 order. Then we will talk about the plan
@bagheera369 i really cant promise for the custom color, because i will pay much more for the Original Color's production. These colors are in the D2 catalogue and it is very expensive.
But i will try my best
EDIT: My plan is to finish all 40pc in 75-90 days to ship ready