Hello People
Lets make some updates.
Cabinet painted and came to me yesterday. I have tested it wiith GREEN which is my favaorite color

. I think it looks cool.
The new Bezel is ready and tested
19" Monitor tested normally and Tate mode.
The frame is working very well with normal mode. But if you want to use it TATE MODE, you have to remove the Wings and chasis table. So i will put some extra wood table for your chasis on the middle bottom. And i will put some standoff, to not make any problem about the Cable's length.
So i have tested all the details and everything is looks good for me now. All the datas are ready to send CNC for the 120pc of the cabinet.
I have shipped a frame to
@Rg111 to test it with his CRT tube too, to check it double

Thanks to him again to ship to me his original Frame . After he check it with his CRT, all the datas will go to CNC CUT. That means we will start to big production process officially. I knoww the Frame problem cost very long time for US. But i have to be sure for everything
Thanks to everyone for their great efforts. It will never happen without this community
I think the CNC CUT and Bending process will take 15 days maximum. In the meantime, i will complete the Smoke Pleksiglass mold, and complete the all artwork, stickers etc.
The plan is complete the 40pc of the cabinet in 45 days. I will work with some of friends to make it faster.
pictures.